Family bathroom, full strip-out
1980s bathroom stripped to the frame: new layout, walk-in shower, wall-hung vanity and certified waterproofing.
- Completed
- February 2026
- Duration
- 4 weeks
- Size
- 2.4 × 2.8 m
- Waterproofing
- Certified
- Handover
- On date
24/7 emergency make-safe — burst pipes, storm damage, roof leaks
Call 0491 570 156Renovations
Full kitchen and bathroom renovations with licensed plumbing, waterproofing and tiling under one contract and one supervisor.
Licensed builder
Form & Trade Building Co. Pty Ltd
Insured
$20M public liability
In trade
17+ years
Google rating (sample)
4.9 / 5 · 180+ reviews
Renovations go wrong when trades don’t talk to each other. We run plumbing, electrical, waterproofing, tiling and joinery to one schedule, with one supervisor you can call.
Recent jobs
1980s bathroom stripped to the frame: new layout, walk-in shower, wall-hung vanity and certified waterproofing.
Wall removed with an engineered beam to open the kitchen to the living area; new island, butler's pantry and flooring.
FAQ
A typical full bathroom takes 3–4 weeks. We plan the noisy and wet stages first and tell you the exact days you'll be without it.
Either way works. We can supply through our trade accounts or install what you choose; the quote shows both clearly.
Yes. Waterproofing is done by a licensed waterproofer and you receive the certificate at handover.
Free quote
Three details are enough to start. Photos and the rest are optional.
★★★★★
“They quoted a fixed price, gave us a schedule and finished the week they said. The supervisor sent photos every Friday.”
Rather talk? 02 5550 4821
Request received
We call back within 2 business hours. Your reference is .
Your suburb is outside our usual area. We’ll still read your request and tell you straight if we can help.
Some photos couldn’t be attached from this browser. We’ll ask for them when we call.
Urgent? Call 02 5550 4821